Phone 919-828-7782 (919) 828-7782

Our Projects
Contact Us
 
 
 
        How to Contact Us
 
 
        Request for Proposal

Testimonials About Our Raleigh, NC Construction Projects

A Letter of Recommendation from the City of Raleigh

The purpose of this letter is to recommend Harrod and Associates Constructors, Inc. as a general contractor in good standing with City of Raleigh Public Utilities. The aforementioned contractor performed in a manner consistent with honesty and quality craftsmanship.
Additionally, their level of customer service was superb both during the project and on a subsequent callback.

The project involving the Public Utilities Operation Center was an extensive remodeling job covering three different sites across Wake County. As in the case with large remodeling projects, the reality on the ground often becomes “fluid” and complex compared to what exist on a drawing. Ed Long, Harrod’s project coordinator was the epitome of patience and reason throughout numerous changes mandated by myself. To this day, well over a year after completion, Mr. Long and his company continue to be a valuable business partner.

It is without reservation that I recommend both Harrod and Associates, and Ed Long as a General Contractor of choice.

Sincerely,

Kermit Chapman
City of Raleigh
Utility Support Superintendent

A Letter of Recommendation from St. David's School

It is my distinct pleasure to recommend Harrod & Associates Constructors as a Design-Builder. Harrod & Associates has recently finished an estimated 54,000 square foot facilities improvement project, with an additional 24,000 square foot parking deck, at St. David’s School to our complete satisfaction. St. David’s is an independent K-12 school in Raleigh, NC with an approximate enrollment of 600 students. The scope of our facilities improvement project included the construction of the following buildings on our 14.6-acre campus: gymnasium, locker rooms, athletic offices, fine arts theatre, concessions area, student commons area, dining hall, welcome center, band and choral classrooms, music practice rooms, and several flexible space areas which we are currently using as classrooms. This project began in June of 2008 and was completed in April of 2010. In my capacity as Upper School Principal for St. David’s, I also served a dual role as Project Manager for the construction of these buildings and worked closely with Harrod & Associates on behalf of the school.

The scheduling of this project was challenging and quite complex. It is important to note that during the twenty-two month span of this construction project, our school was in session for eighteen of those months; the remaining four months were during the summer. It is a testament to Harrod & Associates’ commitment to maintaining a strict schedule that this project was completed without interruption to the school calendar and with minimal disruption to the daily operations of the school. Harrod & Associates understood the potential conflicts between both the school and construction calendars and willingly worked within our timeframe to accommodate the school’s needs.

The quality of construction exceeded our expectation for this project. Harrod & Associates paid particular attention to the details of the project, working thoroughly on all areas of construction and reacting well to changes in plans and modifications to the design. They accommodated the school’s special requests with ease and provided a quick response and resolution to any area of concern. Thanks to their diligence in completing quality work, the amount of punch list items at the end of the project was kept to a minimum. We are very pleased that the overall project was completed on time and within budget expectations.

Throughout my working relationship with Keith Harrod, Ed Long, Dave Geesey, and the entire Harrod & Associates team, I was impressed by their dedication to completing this project with professionalism, character, and integrity. It is clear that operating with such professionalism is a business model adopted by all Harrod & Associates team members.

Thanks to the conscientious team at Harrod & Associates, the St. David’s School community is thrilled to enjoy these new facilities. I would highly recommend Harrod & Associates without hesitation for any future construction project. Feel free to contact me if you need any further information regarding this recommendation.

Sincerely,

David Ennis
Upper School Principal
St. David's School
Raleigh, NC 27609

A Letter of Recommendation from DTW Architects

DTW Architects & Planners, Ltd has had the pleasure of working with Harrod and Associates Constructors on multiple construction projects for city, county, and state government agencies and would recommend them for future jobs of this type. Our firm has known the company both professionally and personally for many years and have worked with them to complete many publicly bid projects. They are highly skilled in project management and coordination and produce a well crafted and constructed building. Harrod is able to adapt and flow with a changing situation which is important in today’s economic climate. As an architect it is not often that you get to work with a contractor on a bid job that you feel is watching out for more than their bottom line, but Harrod is such a contractor. They understand the dynamics of the owner-architect-general contractor relationship and strive to meet all the goals, but most of all Harrod takes a pride in the buildings they build, and that is reflected in their people and their work.

Sincerely,

J. Paul Young, AIA

Church Construction School Construction Retail Space Office Space

Harrod & Associates Constructors, 6612 Fleetwood Drive, Raleigh, NC  27612

© 2014 - All rights reserved

Website Design and SEO by WSI